7 AM–7 PM · 7 days a week Callback within 45 minutes Call (480) 447-1473

Our specialty · Glendale, AZ

Panel Upgrades

Most Valley homes were wired for a fraction of today's electrical load. When the panel cannot keep up, the house tells you: breakers trip, lights flicker, and there is nowhere left to plug in. We replace the panel, pull the permit, and get it inspected. We work on panels of every size, from 100-amp service in a small home to large commercial panels.

Open breaker panel with black breakers
A right-sized panel, modern breakers, proper labeling.

Signs you need one

Is your panel keeping up?

  • Breakers trip often, especially when the AC, dryer, or oven runs at the same time as something else.
  • Lights flicker or dim when a big appliance kicks on.
  • 100-amp service in a house that now runs modern appliances, a home office, or an EV.
  • No open breaker spaces left, or the panel is crowded with tandem breakers.
  • A planned addition: hot tub, EV charger, workshop, or AC upgrade that the current service cannot carry.
  • The panel is old, warm to the touch, or smells like burning. If you smell burning or see sparking, call 911 first, then us.

If any of that sounds familiar, an evaluation will settle it. We come out the same week, usually within 3 days, and tell you what the panel can and cannot do.

What an upgrade includes

Not just a new box

A panel upgrade is a service upgrade, not a swap. Here is what the job covers:

  • Load calculation. We size the new service to what your house actually draws, plus what you plan to add, so you are not back in five years.
  • Permit pulled. Panel work is permitted work. We handle the city paperwork and schedule the inspection.
  • Utility coordination. The power company is involved when service size changes. We coordinate the disconnect and reconnect.
  • A right-sized new panel, from 100-amp service in a small home to 200-amp for most modern homes and larger service for big homes and commercial buildings, with room to grow, modern breakers, and proper labeling.
  • Code corrections found along the way are flagged and priced before we touch them, never buried in the bill.

We also handle fuse-to-breaker conversions for older homes still running on a fuse box.

The honest timeline

How long does a panel upgrade take?

  1. Evaluation: same week, usually within 3 days of your call.
  2. Install: up to 3 weeks from approval, because the city permit and inspection schedule set the pace.
  3. Emergency only: 24 to 48 hours is possible only if the city deems the job an emergency.

Power is off while the panel is swapped, usually for part of the day. We schedule it with you so nothing in the house is caught off guard.

Common questions

Panel upgrade questions, answered straight

Do I need a 200-amp panel?

Most modern homes do, but the answer comes from a load calculation on your house, not a rule of thumb. A 100-amp panel in a small home with gas appliances may be fine. The same panel with electric range, dryer, AC, and an EV charger is not. We run the numbers before recommending anything.

Do you handle commercial panels?

Yes. We install and upgrade panels for commercial buildings too, from small retail spaces to large service panels. Same process: load calculation, permit, utility coordination, and inspection.

Will my power be off all day?

Power is off during the swap itself, usually for part of the day. We plan the timing with you, and the utility reconnect is coordinated in advance so the outage is as short as the job allows.

Do I need a permit for a panel upgrade?

Yes. Panel and service work is permitted work in every Valley city, and the inspection is what protects you when you sell the house or file an insurance claim. We pull the permit and handle the inspection.

I am adding an EV charger. Do I need a panel upgrade first?

Sometimes, not always. A Level 2 charger is a large continuous load, and whether your panel has room depends on a load calculation. If it fits, we install the charger on the existing panel. If it does not, we will show you the numbers and price the upgrade honestly.

How much does a panel upgrade cost?

It depends on the service size, the condition of the existing wiring, and what the city requires. We do not quote a final price without seeing the panel. The evaluation is free, and you get a straight number before any work starts.

Wondering if your panel is up to the job?

Call or send the form. We will get an evaluation on the calendar the same week and give you a straight answer about what your panel can carry.

Call Now Get a Quote